Home
Search
 
    Construction Diary

Offshore Cable Works

The inter turbine cables are buried in the seabed and link each turbine to the next in the required sequence. The cables were simultaneously laid and buried using an underwater remotely operated vehicle (ROV), which was lowered into the water and tracked from the jack-up barge “Wind”.


Remote operated vehicle used to install cables


back top

sitemap disclaimer